Runway and the zero-cash date
Runway is how long the cash lasts at the current burn. It is the simplest survival metric and the easiest to calculate wrongly, because both sides of the fraction are moving.
The static version
Runway = cash ÷ net monthly burn. With $1.5M of cash and $40,000 of net burn, runway is 37.5 months. That is the right first estimate and the number most companies quote.
Why it overstates
If expenses grow 2% a month and revenue grows 4%, net burn changes every month. A static division assumes the current burn continues forever, which is conservative in one direction and optimistic in the other: it ignores revenue growth, but also ignores hiring and price increases. The simulated version projects both and finds the month the cash crosses zero.
The model
| Input | Example |
|---|---|
| Cash | $1,500,000 |
| Monthly revenue | $100,000 |
| Monthly expenses | $140,000 |
| Net burn | $40,000 |
| Revenue growth | 4% per month |
| Expense growth | 1.5% per month |
| Static runway | 37.5 months |
| Simulated zero-cash | Longer, if revenue outgrows expenses |
In this example revenue grows faster than expenses, so the net burn shrinks and the simulated runway is longer than 37.5 months. If the growth rates were reversed, the static number would be dangerously optimistic.
What counts as cash
Use unrestricted cash and cash equivalents. An undrawn credit line is not cash; a restricted deposit is not available. Include the minimum cash the business needs for payroll and compliance as a floor, and calculate runway to that floor rather than to zero.
The zero-cash date
The date is more useful than the month count because it survives a change in the starting point. If the date is 14 months away and the next fundraise takes nine months, the company has five months of buffer — enough to start, not enough to be late.
Managing to it
- Start the raise when runway is 12–18 months, not when it is four.
- Cut expenses before the date is visible to everyone; cuts late are deeper.
- Model a downside case with flat revenue and the planned hiring.
- Re-forecast monthly; a runway number that is only updated quarterly is a historical artifact.
Basis 27 November 2026. The calculator projects month by month with the growth rates you enter; the result is a planning estimate, not a forecast.
Questions
Should runway include revenue growth?
Yes, for planning. The static cash ÷ burn figure is a useful benchmark, but the decision should use a projection with realistic revenue and expense growth, plus a downside case.
What is a safe runway?
Eighteen months gives time to raise without duress; twelve is the common minimum; under six is an emergency. The right number depends on how long your raise takes and how much of the plan is discretionary.
The third tab projects cash month by month and shows the zero-cash date.
Open the calculatorBasis date 2026.11.27. Written against the published 2026 benchmark reports and standard SaaS definitions; updated when the sources change.
Back to the guides